Sign In | Join Free | My components-electronic.com
China Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. logo
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. Innovation seeks development and Cooperation wins the future.
Verified Supplier

2 Years

Home > Bailey Bridge >

Bailey Bridge Construction Platform Temporary Steel Bridge

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Bailey Bridge Construction Platform Temporary Steel Bridge

  • 1
  • 2

Brand Name : Tongkai

Model Number : TK100

Certification : ISO9001, EN1090,ISO3834

Place of Origin : China

MOQ : 1set

Price : FOB1000USD

Payment Terms : L/C, T/T, Western Union, MoneyGram

Supply Ability : 500T/M

Delivery Time : 15days

Packaging Details : Nude Packing ,Steel case

Material : S460J0,S355JR,S235JR

Single Span : 9~36m

Net Width : 4m~20m

Load : 50T ~250T

Color : Green, Grey, Orange,Red

Application : Construction

Contact Now

Bailey Bridge Deck Type Bridge Compact 100 Large wide Construction Platform Temporary

Brief Introduction

Deck-type panel bridges are normally two lanes, class 50 or higher bridges assembled to replace single-lane bridges. A deck-type panel bridge has the following advantages over a through-type bridge :

  • Roadway can be wider for passage of extra-wide vehicles.
  • Deck-type assembly allows greater side overhang of vehicles.
  • A lighter decking system can be used when the roadway is supported by trusses.
  • With some sloping banks, the span between abutments is shorter than in a through-type bridge, because bearings are set 5 feet (1.5 meters) below road level.
  • Demolished piers need not be built Up to the level of the roadway.
  • There are no overhead restrictions.

A deck-type panel bridge has the following disadvantages:

  • Excavation at abutments may be necessary because bearings are 5 feet (1.5 meters) below the roadway.
  • It is more difficult to launch.
  • It must be lowered 5 feet (1.5 meters) onto the bearings.
  • Waterway clearance is decreased.

APPLICATION

  • Temporary bridging
  • Rural infrastructure project
  • Construction Platform
  • Heavy load
  • Wide Width required

Bailey Bridge Construction Platform Temporary Steel Bridge


Product Tags:

Temporary Steel Bailey Bridge

      

Construction Platform Temporary Steel bridge

      

Construction Platform Bailey Bridge

      
Buy cheap Bailey Bridge Construction Platform Temporary Steel Bridge product

Bailey Bridge Construction Platform Temporary Steel Bridge Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)